Project Monitoring

Oil & Gas Measurement Jobs


S/N

JOB DESCRIPTION

CLIENT

JOB COMPLETION DATE

 

(I) GAS METERING:

1

REFURBISHMENT OF DANIEL ORIFICE FITTINGS (GAS METERING)

MAKON ENGINEERING LTD

AUG. 2002

2

INSPECTION AND REPAIR OF PECO ORIFICE FITTING FOR GAS METERING

SOKU GAS PLANT

2004

3

CALIBRATION OF INSTRUMENTS FOR START-UP & COMMISSIONING AMP2 GAS METERING SYSTEM

ELF PETROLEUM NIG. LTD

JAN 2007

4

ROUTINE VALIDATION / CALIBRATION OF INSTRUMENTS OF AMP2 GAS METERING SYSTEM

ELF PETROLEUM NIG. LTD

MAY 2007

5

ROUTINE VALIDATION / CALIBRATION OF INSTRUMENTS OF AMP2 GAS METERING SYSTEM

ELF PETROLEUM NIG. LTD

2006 – TILL DATE

6

ROUTINE VALIDATION / CALIBRATION OF INSTRUMENTS OF AMP2 GAS METERING SYSTEM FEBRUARY 2008

ELF PETROLEUM NIG. LTD

FEBRUARY 2008

7

SERVICING AND REPAIRS OF CHROMATOGRAPH

ELF PETROLEUM NIG. LTD

MARCH 2008

(II) LIQUID MEASUREMENT :

1

SUPPLY , INSTALLATION & COMMISSIONING OF ACCULOAD III’ PRIME 4 METERS & ACCESSORIES

ZENON PETROLEUM & GAS LTD

AUG. 2003

2

SUPPLY AND INSTALLATION OF LOADING ARM AND FLOW METERS

ZENON PETROLEUM & GAS LTD

MARCH 2003

3

SUPPLY, INSTALLATION AND COMMISSIONING OF LOADING ARMS, METERS & ACCESSORIES

CONOIL

MARCH 2003

4

SUPPLY, INSTALLATION AND COMMISSIONING OF LIQUID CONTROLS PD METERS & ACCESSORIES

CONOIL

MAY 2003

5

SUPPLY AND INSTALLATION OF SMITH I/O ACCULOAD BOARD

UNIPETROL

JAN. 2003

6

SUPPLY AND INSTALLATION OF ACCULOAD II BOARD

TOTALFINAELF

FEB. 2003

7

SUPPLY AND INSTALLATION OF SMITH PD METERS AND ACCESSORIES

ZENON PET. & GAS LTD

JUNE 2003

8

SUPPLY AND INSTALLATION OF SMITH MODEL F4-S1 FLOW METER C/W ACCESSORIES

CONOIL PLC

SEPT. 2003

9

SUPLY AND INSTALLATION OF 6 NOS SMITH METERS

LAGOS

SEPT. 2003

10

SUPPLY / INSTALLATION OF ACCULOAD III, P4 METERS, PUMPS AND ACCESSORIES

APAPA

NOV. 2003

11

TECH VALIDATION OF AMP2 GAS METERING INSTRUMENTS

TOTAL E & P NIG LTD

SEPT 2009

12

AKPO FISCAL OIL METERING SKID ANNUAL VALIDATION

TOTAL UPSTREAM LTD

2012/2013

13

USAN FISCAL OIL METERING SKID ANNUAL VALIDATION

TOTAL UPSTREAM LTD

2013

(III) CALIBRATION OF FLOW MEASUREMENT EQUIPMENT :

1

CALIBRATION OF 6 NOS FLOW METER

APAPA

NOV. 2003

2

CALIBRATION OF METER RUN 101 & 102 & REASSEMBLY OF METER

APAPA

DEC. 2003

3

REPAIR AND CALIBRATION OF N0I & 4 SMITH SF-60

APAPA-LAGOS

JAN. 2004

4

TANK CLEANING AND CALIBRATION SERVICES IN ALL LOCATIONS

LAGOS

JULY 07 TO JUNE 2008

5

CALIBRATION OF ULTRASONIC AND ELECTROMAGNETIC FLOW METER

TOTAL E & P NIG LTD

JAN 2010