S/N |
JOB DESCRIPTION |
CLIENT |
JOB COMPLETION DATE |
(I) GAS METERING: |
|||
1 |
REFURBISHMENT OF DANIEL ORIFICE FITTINGS (GAS METERING) |
MAKON ENGINEERING LTD |
AUG. 2002 |
2 |
INSPECTION AND REPAIR OF PECO ORIFICE FITTING FOR GAS METERING |
SOKU GAS PLANT | 2004 |
3 |
CALIBRATION OF INSTRUMENTS FOR START-UP & COMMISSIONING AMP2 GAS METERING SYSTEM |
ELF PETROLEUM NIG. LTD | JAN 2007 |
4 |
ROUTINE VALIDATION / CALIBRATION OF INSTRUMENTS OF AMP2 GAS METERING SYSTEM |
ELF PETROLEUM NIG. LTD | MAY 2007 |
5 |
ROUTINE VALIDATION / CALIBRATION OF INSTRUMENTS OF AMP2 GAS METERING SYSTEM |
ELF PETROLEUM NIG. LTD | 2006 – TILL DATE |
6 |
ROUTINE VALIDATION / CALIBRATION OF INSTRUMENTS OF AMP2 GAS METERING SYSTEM FEBRUARY 2008 |
ELF PETROLEUM NIG. LTD | FEBRUARY 2008 |
7 |
SERVICING AND REPAIRS OF CHROMATOGRAPH |
ELF PETROLEUM NIG. LTD | MARCH 2008 |
(II) LIQUID MEASUREMENT : |
|||
1 |
SUPPLY , INSTALLATION & COMMISSIONING OF ACCULOAD III’ PRIME 4 METERS & ACCESSORIES |
ZENON PETROLEUM & GAS LTD |
AUG. 2003 |
2 |
SUPPLY AND INSTALLATION OF LOADING ARM AND FLOW METERS |
ZENON PETROLEUM & GAS LTD | MARCH 2003 |
3 |
SUPPLY, INSTALLATION AND COMMISSIONING OF LOADING ARMS, METERS & ACCESSORIES |
CONOIL | MARCH 2003 |
4 |
SUPPLY, INSTALLATION AND COMMISSIONING OF LIQUID CONTROLS PD METERS & ACCESSORIES |
CONOIL | MAY 2003 |
5 |
SUPPLY AND INSTALLATION OF SMITH I/O ACCULOAD BOARD |
UNIPETROL | JAN. 2003 |
6 |
SUPPLY AND INSTALLATION OF ACCULOAD II BOARD |
TOTALFINAELF | FEB. 2003 |
7 |
SUPPLY AND INSTALLATION OF SMITH PD METERS AND ACCESSORIES |
ZENON PET. & GAS LTD | JUNE 2003 |
8 |
SUPPLY AND INSTALLATION OF SMITH MODEL F4-S1 FLOW METER C/W ACCESSORIES |
CONOIL PLC | SEPT. 2003 |
9 |
SUPLY AND INSTALLATION OF 6 NOS SMITH METERS |
LAGOS | SEPT. 2003 |
10 |
SUPPLY / INSTALLATION OF ACCULOAD III, P4 METERS, PUMPS AND ACCESSORIES |
APAPA | NOV. 2003 |
11 |
TECH VALIDATION OF AMP2 GAS METERING INSTRUMENTS |
TOTAL E & P NIG LTD | SEPT 2009 |
12 |
AKPO FISCAL OIL METERING SKID ANNUAL VALIDATION |
TOTAL UPSTREAM LTD | 2012/2013 |
13 |
USAN FISCAL OIL METERING SKID ANNUAL VALIDATION |
TOTAL UPSTREAM LTD | 2013 |
(III) CALIBRATION OF FLOW MEASUREMENT EQUIPMENT : |
|||
1 |
CALIBRATION OF 6 NOS FLOW METER |
APAPA |
NOV. 2003 |
2 |
CALIBRATION OF METER RUN 101 & 102 & REASSEMBLY OF METER |
APAPA | DEC. 2003 |
3 |
REPAIR AND CALIBRATION OF N0I & 4 SMITH SF-60 |
APAPA-LAGOS | JAN. 2004 |
4 |
TANK CLEANING AND CALIBRATION SERVICES IN ALL LOCATIONS |
LAGOS | JULY 07 TO JUNE 2008 |
5 |
CALIBRATION OF ULTRASONIC AND ELECTROMAGNETIC FLOW METER |
TOTAL E & P NIG LTD | JAN 2010 |