
Service #1
Validation & Calibration
We provide a very high degree of assurance that a specific process, equipment, method.
S/N | JOB DESCRIPTION | CLIENT | COMPLETION DATE |
---|---|---|---|
1. | Engineering, procurement and construction of fire fighting system. | Zenon Petroleum & Gas Ltd | 2002 / 2003 |
2. | Design, Procurement, Installation & Commissioning of Angus fire fighting system | Totalfinaelf Nig Plc | Feb, 2003 |
3. | Design, Fabrication, Installation and commissioning of motor control center (MCC PANEL). | Zenon Petroleum & Gas Ltd | June, 2003 |
4. | Design and construction of 6000 MT storage tank. | Zenon Petroleum & Gas Ltd | April, 2003 |
5. | Design & Building of fire pump house. | Zenon Petroleum & Gas Ltd | May, 2004 |
6. | Design, Fabrication, Installation & Commissioning of Skid mounted loading facility | Zenon Petroleum & Gas Ltd | 2004 |
7. | Tank Farm piping design and construction | Zenon Petroleum & Gas Ltd | 2004 |
8. | Piping and structural works for additional AGO BRV loading gantry. | CONOIL | 2004 |
9. | Construction of Metering facilities for Capital Oil in Calabar. | Calabar | 2007 |
We provide a very high degree of assurance that a specific process, equipment, method.
We provide a very high degree of assurance that a specific process, equipment, method.
We provide a very high degree of assurance that a specific process, equipment, method.
We provide a very high degree of assurance that a specific process, equipment, method.